Provided estimating for this project which consisted of raising and repairing the Beer Kill Levee which is a 9,025 SQFT earthen berm levee/2,677 SQFT Flood wall and 655 SQ FT Capped Flood wall to mitigate future flood disasters. Improvements also included cahnnel relocation, interior drainage facilities, gated gravity conduits, swales and ditches, manholes, drop inlets and ponding areas.
Ellenville Beer Kill Levee
AGENCY/OWNER: GOSR
CLIENT: Tectonic Engineering
PROJECT VALUE: TBD
PROJECT CATEGORY: Emergency Management
PROJECT DETAILS: